TitleTipped in DepotNumber of Pages1DimensionsH: 251mm x W: 202mmAccession Number14.161
More Information
Description
A one-page list of materials used for road or footpath construction in the Dorrigo Shire, dated March and April of an unknown year. The material is either sea gravel or shale, and was used in three locations: 'tipped in depot', lane behind P. Bourk, and the State Highway at Woolgoolga Road. The list also includes amount and cost of material.
List of materials used for road or footpath construction, Dorrigo Shire Council. Coffs Collections, accessed 06/04/2026, https://coffs.recollect.net.au/nodes/view/66964